Carolyn came up after supper this evening and took me up to see the progress made today on their house. The floor was put down yesterday and all the framing that is shown was done today. It got up to 94 this afternoon which would have been pretty hot with the sun bearing down and high humidity. Carolyn has poured over the plans to where she knew just how everything was going to look, but for me, it looks much larger that I anticipated. The 9' ceilings give it a larger perspective and with all the framing done with 2 x 6's. I took this picture of some of the beams that are yet to be put it place. Years ago when better old lumber was available, 2 x 10's would have been used instead of these stronger 3-piece I-beams.

No comments:
Post a Comment